[Evergreen-dev] Evergreen Community Feedback Fest Results
Terran McCanna
tmccanna at georgialibraries.org
Mon Oct 3 10:41:50 EDT 2022
Thank you to everyone who participated in last week's Evergreen 3.10
Feedback Fest! A lot of valuable work was done testing patches and features
and integrating approved code into core Evergreen in preparation for the
3.10 feature release and the 3.9.1 bug fixing release.
The progress summary and list of participants is at
https://wiki.evergreen-ils.org/doku.php?id=dev:bug_squashing:2022-09
The next community participation event will be Bug Squashing Week from
October 31-November 4.
Thank you!
Terran & the Evergreen 3.10 Release Team
PS: As a general reminder, there are a significant number of open
pullrequests for patches that need to be reviewed and tested by developers
or system administrators with direct access to a server (as opposed to
testing from the web interface). A list of these is available starting on
line 34 here:
https://docs.google.com/spreadsheets/d/1r0RyFB_Sj1RHdVacylCNBt-YS3S7VlXguWYWMqk40so/edit#gid=984932811
Terran McCanna, PINES Program Manager
------------------------------
Georgia Public Library Service | University System of Georgia
2872 Woodcock Blvd, Suite 250 l Atlanta, GA 30341
(404) 235-7138 | tmccanna at georgialibraries.org
http://help.georgialibraries.org | help at georgialibraries.org
<https://www.facebook.com/georgialibraries>
<https://www.twitter.com/georgialibs>
<https://www.instagram.com/georgialibraries/>
<https://www.twitter.com/georgialibs>
Join our email list <http://georgialibraries.org> for stories of Georgia
libraries making an impact in our communities.
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://list.evergreen-ils.org/pipermail/evergreen-dev/attachments/20221003/0c7abbac/attachment.htm>
More information about the Evergreen-dev
mailing list