[OPEN-ILS-DEV] Aug 1 feature freeze clarification
Bill Erickson
erickson at esilibrary.com
Tue Jul 31 14:22:13 EDT 2012
Hi all,
Just a quick note about the Beta feature freeze...
A feature freeze date of Aug 1 means all code needs to be merged by the evening of Aug 1 (i.e. before Aug 2). It occurs to me that just saying "Aug 1" was ambiguous and likely lead to some confusion. Apologies. Given this, Beta1 won't be cut until Aug 2, since we'll need time to finalize the DB upgrade script and do some testing.
Thanks
-b
--
Bill Erickson
| Senior Software Developer
| phone: 877-OPEN-ILS (673-6457)
| email: erickson at esilibrary.com
| web: http://esilibrary.com
| Equinox Software, Inc. / Your Library's Guide to Open Source
More information about the Open-ils-dev
mailing list