[OPEN-ILS-DEV] 2.2 RC1 real soon now - "first" last call
Lebbeous Fogle-Weekley
lebbeous at esilibrary.com
Mon May 7 14:56:02 EDT 2012
As 2.2 release maintainer, I want to get 2.2 RC1 cut and officialized by
Monday, May 14.
At Dan Scott's suggestion, this is the first of two "last calls" for
showstopping bugs or other blocking issues. Speak now.
This is the "pre-tarball" last call. Input from folks on bugs and
blockers comes from their experience with the rel_2_2 branch (or alpha
tarballs). Around midweek we'll actually produce an rc1 tarball, and the
second, or "post-tarball" last call should based on bugs and blockers
witnessed from actually running the code in the tarball.
These are on currently on my radar, to make sure they get addressed before
I ask Thomas to cut the 2.2 rc1 tarball.
https://launchpad.net/bugs/758982
https://bugs.launchpad.net/evergreen/+bug/960369
https://bugs.launchpad.net/evergreen/+bug/996024
https://bugs.launchpad.net/evergreen/+bug/986196
Thanks!
--
Lebbeous Fogle-Weekley
| Software Developer
| Equinox Software, Inc. / Your Library's Guide to Open Source
| phone: 1-877-OPEN-ILS (673-6457)
| email: lebbeous at esilibrary.com
| web: http://www.esilibrary.com
More information about the Open-ils-dev
mailing list