[OPEN-ILS-DEV] Acq development request for consideration
David Fiander
david at fiander.info
Wed Mar 5 13:03:00 EST 2008
Bill,
I suspect that this will be a policy decision rather than something
that staff will think about when selecting or ordering materials.
That is, we either always create a single stub bib record for the
title, or we always create a bib record and associated item records.
- David
On Wed, Mar 5, 2008 at 12:59 PM, Carri L. Oviatt <cloviatt at orem.org> wrote:
> Bill,
>
> Yes, that would work, provided that we could set up a default and not need to make a decision on every item added, but have the option available for the exceptions to the rule. Thanks.
>
> >>> Bill Erickson <erickson at esilibrary.com> 3/5/2008 10:52 AM >>>
>
>
> Carri L. Oviatt wrote:
> > Assuming that the option will be given to create item/holding records at the time an order is created, is it possible to place that option on the individual PO line rather than for an entire PO?
> >
>
>
> Hi, Carri
>
> This is quite do-able with the existing architecture. I imagine there
> will be a variety of criteria for determining which lineitems create
> holdings at order time. I can see one of those criteria being a simple
> "create holdings" checkbox (or some such) next to each lineitem at PO
> creation time.
>
> Is that more or less what you are getting at?
>
> -bill
>
> --
> Bill Erickson
> | VP, Software Development & Integration
> | Equinox Software, Inc. / The Evergreen Experts
> | phone: 877-OPEN-ILS (673-6457)
> | email: erickson at esilibrary.com
> | web: http://esilibrary.com
>
>
More information about the Open-ils-dev
mailing list